Migration and integrations
Move data, connect what stays
Switching tools is scary because of the data. We move it cleanly, preserve history, and connect the systems that need to talk to each other.
Migration work
We pull your data out of existing systems, including ones with poor export options.
We fix inconsistencies, merge duplicates, and map fields to the new structure.
Past records, audit trails, and timestamps come along. You don't start from zero.
We verify the data landed correctly before you flip the switch.
Integration work
Direct integrations with systems you're keeping. No Zapier fees, no fragile webhooks.
Changes in one system reflect in another. No manual copying.
Connect old systems that weren't designed to talk to anything.
Move data on a schedule for reporting, backup, or compliance.
Common scenarios
How we approach migrations
Frequently asked questions
We can migrate virtually any structured data: customer records, transaction history, product catalogs, user accounts, documents, media files, and custom data structures. We handle exports from databases, SaaS platforms, spreadsheets, legacy systems, and proprietary formats. If it's stored digitally, we can usually extract and move it.
Timeline depends on data volume and complexity. Simple migrations (one system to another with clean data) take 2-4 weeks. Complex migrations involving multiple sources, significant data cleanup, or custom transformations typically take 6-12 weeks. We provide a detailed timeline estimate after analyzing your current systems.
We minimize downtime by running parallel systems during the transition. Most of the migration work happens in the background with your current systems still operational. The actual cutover—when you switch to the new system—typically requires only a few hours, often scheduled outside business hours.
We run multiple validation passes: row counts, data integrity checks, relationship verification, and business rule validation. Before cutover, we provide detailed reports showing exactly what moved, what was cleaned or transformed, and any records requiring review. You approve the migration before we flip the switch.
Every migration includes a rollback strategy. We maintain complete backups of source data, keep the original systems operational until you confirm success, and document the exact steps to reverse the migration if needed. We've never had to fully roll back, but the safety net is always there.
Tell us what needs to move
Describe your current systems and where you're going. We'll outline a migration plan and estimate.